IT + HR

IT onboarding kit with devices: laptop and welcome kit, one dispatch.

The MacBook or laptop quoted from an authorised reseller, the peripherals and the branded welcome kit — packed together and delivered to the office or to the new hire's home before day one.

Buds Apex — IT onboarding kit item
Forest Column Pen Stand — IT onboarding kit item
Car Power 30 — IT onboarding kit item
Chester Laptop Bag — IT onboarding kit item
The short answer

Yes — one vendor can supply the device and the welcome kit in one dispatch. Adalwin Commerce quotes MacBooks, iPads and business laptops from an authorised reseller, adds the peripherals IT specifies (mouse, hub, headset, sleeve), and the HR welcome kit is built on the Swpe deck from 479 live kit items; everything is packed as one consignment to the office or one tracked parcel to the new hire's home, on one GST invoice. IT keeps control of the device (enrolment and setup happen on IT's side or via the device programme); HR keeps control of the kit; the joiner gets one box on day one instead of three deliveries over a fortnight.

479
peripherals and kit items live on the deck
10
brands
₹72 – ₹7,999
list price (MRP) range
10
typical minimum order
37
take your logo

What is in a combined IT + HR onboarding kit?

OwnerItemsSource
ITMacBook / laptop, charger, hub, mouse, headsetQuoted from an authorised reseller; peripherals from the deck or IT's standard
ITLaptop sleeve or backpackDeck — logo-ready options
HRBottle, notebook + pen, apparel, welcome noteDeck — the standard welcome kit
BothBranded outer box, printed card, asset labelKitting

Who does what, and when?

  1. 1

    IT specifies

    Model and configuration, peripherals, and whether the device is enrolled before or after delivery.

  2. 2

    HR builds the kit

    Per-head budget, items from the deck, sizes from the roster.

  3. 3

    One proposal

    Devices, peripherals and kit itemised; dispatch per office or per home as its own line.

  4. 4

    One dispatch

    Packed together, tracked, timed to the joining date; exceptions flagged back the same day.

What about remote hires and device security?

For a remote joiner the combined parcel goes to the home address on the roster with tracking and a named receiver. Whether the device ships enrolled or is enrolled on first login is IT's decision; the kit does not change it. For rental or leased devices, the same dispatch applies — the device programme and the welcome kit are separate lines on one invoice.

On the deck now

Peripherals and sleeves, live.

Hubs, chargers, sleeves, backpacks and desk items on the deck now — the half of the box that HR and IT share.

MRP is the maker's list price. Your quoted price at quantity is at or below it, shown ex-GST on the proposal.

How it works

Brief, swipe, proposal — then we deliver.

1

Set your brief

Headcount, per-head budget, joining dates, office or home delivery. The deck filters to it before you see a card.

2

Swipe to shortlist

Right to keep, up for a must-have. Add your logo, or let each joiner pick one item through a link.

3

Get a quoted PDF

Your kit becomes a proposal with per-unit quotes and lead times. Approve, share the roster, and Adalwin packs and delivers.

Questions

IT onboarding kit with devices, answered.

Can one vendor in India supply a MacBook and a branded welcome kit to a new hire's home?

Yes. Adalwin Commerce quotes the device from an authorised reseller, the kit is built on the Swpe deck, and both ship together as one tracked parcel to the home address on the roster, on one GST invoice.

Does IT lose control of the device if it ships with the kit?

No. Enrolment and setup stay with IT — before dispatch or on first login, as IT prefers. The kit is packed around the device; it does not touch it.

Can leased or rented laptops be included?

Yes. A rented device and the welcome kit are separate lines on one proposal and go out in the same dispatch.

How early should a device + kit order be placed?

Devices depend on configuration and stock — in-line models in about a week to ten days, built-to-order configurations longer — so brief IT's side first. The kit's three-to-four-week timeline usually fits inside it.

Reviewed by Sameer Kishore Singh, Founder, Adalwin Commerce · Catalogue data is live; copy last reviewed 20 September 2026.

Get a quote

Tell us the headcount and budget. We’ll do the rest.

Options and per-unit quotes at your quantity, usually within a business day. No account needed — and the deck is free to browse any time.

We use these details only to send you gifting options and quotes for your company. Privacy

Chat on WhatsAppGet a quote